Warning
  • JUser: :_load: Unable to load user with ID: 980

2019 potholes filled to date:

5,095

Water Treatment Project: Plant Upgrades Updated 04/05/2019

Water Treatment Project: Plant Upgrades


What is this project going to accomplish?
The United States Environmental Protection Agency (USEPA) has enacted the Long-Term 2 Enhanced Surface Water Treatment Rule (LT2). The rule places more stringent requirements for the removal or inactivation of the waterborne pathogen Cryptosporidium. To meet this standard, UV disinfection will replace the existing disinfection process (ozonation) and other upgrades will be made to provide greater system reliability. The project is now in the testing phase of the UV disinfection system.  During the testing phase, the City will be on well water.  The testing phase is estimated to be completed by the end of April 2019.  Before the new system is placed in operation for public consumption, the City must receive approval from the Department of Health.  The project is estimated to be substantially completed by July 2019.

Project Site Map


Other Project Documents:

 

Last modified on Monday, April 15, 2019

Hello Progress.

Log In or Register